![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
The contractor, Dave, came round this morning. 8am sharp. They've put a radiator in my toilet, and a new loft access hatch at the top of the stairs.
See my shiny new radiator!

No more cold knees when I pee! Hopefully this will also help prevent the wall from getting damp.
And the loft hole:

So now I have more space! We will wait for Dave to come back and finish off though - the insulation in the attic is not good, so he is going to come back and put proper insulation in. He is also going to come back and re-do the pointing on the outside of the house.
All of this should add up to a warmer, less damp house. Not sure about the windows though. No word on getting double glazing at the back yet.
When the insulation is done, I am going to utilise some of the spare boards I have lying around and put stuff up in the attic that we don't really need access to right now. In nice, watertight plastic crates (in case the roof leaks).
See my shiny new radiator!

No more cold knees when I pee! Hopefully this will also help prevent the wall from getting damp.
And the loft hole:

So now I have more space! We will wait for Dave to come back and finish off though - the insulation in the attic is not good, so he is going to come back and put proper insulation in. He is also going to come back and re-do the pointing on the outside of the house.
All of this should add up to a warmer, less damp house. Not sure about the windows though. No word on getting double glazing at the back yet.
When the insulation is done, I am going to utilise some of the spare boards I have lying around and put stuff up in the attic that we don't really need access to right now. In nice, watertight plastic crates (in case the roof leaks).